Open Swarm โ€” a governed agentic operating layer

Agentic AI you can actually run.

Open Swarm (oshal) turns agentic AI from one clever prompt into an operated platform: specialized bots on the harness and model that fit their job, thousands of connectors brokered per user, isolated tenants, a workflow generator, and real applications people can open today.

Per-bot modelsEach bot chooses its harness, provider, and model
1,300+ connectorsImportable on demand from the marketplace
Tenant + user isolationPostgres RLS and per-user storage
Workflow generatorDescribe work, get a runnable queue
Screenshot of the full oshal cockpit with assistant, applications, and operations tooling loaded
The signed-in cockpit: assistant, app routing, queues, mesh, logs, costs, and approvals in one surface.
Screenshot of the oshal assistant Jarvis with voice controls and command center
Jarvis: a single front door that routes voice and text into the right app and workflow.
The platform

oshal is Open Swarm: any harness, API, or LLM.

oshal is a multi-tenant, multi-user, multi-agent runtime where specialized bots run different agent harnesses, API providers, or LLMs, coordinate over a Redis Streams mesh, and register new apps, tools, agents, and workflows while the swarm is running.

The point is practical: turn agentic AI into a governed operating layer with tenant and user boundaries, tickets, roles, connector-backed data access, cost attribution, review gates, and applications people can actually use.

TypeScript Node.js Redis Streams Postgres + RLS ChromaDB RAG Docker Compose Kubernetes OIDC / Keycloak Connector broker A2A remote agents Local LLMs

Built by Roger Murphy.

Agentic Federal is the proof bench; Open Swarm is the flagship. If you are evaluating the platform, or hiring for senior AI platform, full-stack, or automation work, the About page has the engineering story and a resume.